ATS Top Header

CASE STUDY

DOVE VALLEY

PARK PROJECT

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

171m x 60m x 13.3m
Building
Footprint
14m High-level
Ductwork
Working Height
100% Optional
Duty/Standby
Redundancy

CASE STUDY

DOVE VALLEY

PARK PROJECT

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

171m x 60m x 13.3m
Building
Footprint
14m High-level
Ductwork
Working Height
100% Optional
Duty/Standby
Redundancy

CASE STUDY

DOVE VALLEY

PARK PROJECT

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

171m x 60m x 13.3m
Building
Footprint
14m High-level
Ductwork
Working Height
100% Optional
Duty/Standby
Redundancy

PROJECT BACKGROUND

ATS was appointed to deliver a complete JETFLO air induction heating, cooling, and ventilation system for a large-scale warehouse facility at Dove Valley Park.

PROJECT STATISTICS

ATS was appointed to deliver a complete JETFLO air induction heating, cooling, and ventilation system for a large-scale warehouse facility at Dove Valley Park.