Case Study
Biggleswade
Warehouse Project

A complete HVAC solution delivered at speed, combining high-performance air handling, low-carbon heating and fully integrated controls.

4–5 Weeks
Accelerated
Programme
100% Design
Targets
Achieved
24/7 Remote
Monitoring
Capability

Project Background

ATS was appointed to deliver a complete HVAC solution for a warehouse facility in Biggleswade, designed to meet both heating and ventilation demands efficiently within a live project programme.

The project required the integration of a high-performance air handling system with low-carbon heating technology, ensuring consistent internal conditions while maintaining energy efficiency and compliance with modern environmental standards.

A key driver for the project was programme speed. ATS successfully delivered the full installation including major plant, ductwork distribution, and associated pipework within an accelerated 4–5 week programme, minimising disruption and ensuring rapid operational readiness for the client.

Project Statistics

  • Location: Biggleswade
  • Programme Duration: 4–5 weeks
  • System Type: AHU with ASHP-led LPHW system
  • Primary Plant: 1no. internal AHU, 2no. Air Source
    Heat Pumps
  • Distribution: Jetflo air distribution system
  • Controls: Integrated BMS with remote monitoring